Launching soon — join the early access list

Write site-specific RAMS in minutes —
not every evening.

Generic, copy-paste method statements get rejected for the wrong site name or vague controls — and a rejected RAMS means no start on site. RapidRAMS builds CDM-ready risk assessments and method statements tailored to each job, so you're accepted first time and on site on Monday.

  • Site-specific in minutes
  • Built around CDM 2015
  • Reuse & adapt past RAMS
  • Accepted first time

Built for UK subcontractors and trades — scaffolders, electricians, groundworkers, roofers and more

Your RAMS
Apex Scaffolding Ltd · 9 live jobs · 4 RAMS this week
5 Accepted 2 Submitted 1 Needs revision
Project / SiteTaskUpdatedStatus
Oakfield Phase 2Scaffold erection — Block CTodayAccepted
Riverside WharfLoading bay & edge protectionTodaySubmitted
Station Road Plot 14Tower scaffoldYesterdayNeeds revision
Kingsway RetailAccess scaffold — east elevation2 days agoAccepted

The cost of getting RAMS wrong

£millions
Fines for serious health & safety breaches under the Sentencing Council guidelines — scaled to turnover.
Days lost
A method statement rejected by the principal contractor can stop you starting on site — labour booked, no work done.
Every site
Each new job needs its own site-specific RAMS. Generic copy-paste documents are the most common reason they get rejected.

Figures vary by case, turnover, year and jurisdiction. Always check current guidance — see the HSE construction pages.

What it does

RAMS without the evening rewrite

Replace the blank Word document and the copy-paste-and-pray with a tool built around how site work actually gets approved.

Site-specific, not copy-paste

Answer a few questions about the job and RapidRAMS produces a method statement tailored to that site — correct address, scope, sequence and hazards. The exact thing principal contractors send generic RAMS back for.

A library you actually reuse

Save your methods, hazards and control measures once. Reuse them on the next job in two clicks and just swap the site details — no blank Word document, no starting from scratch.

CDM-ready and submission-ready

Structured around the Construction (Design and Management) Regulations 2015 with specific controls — not "take care" and "use PPE". Export a clean PDF, brief your crew, and submit for approval.

How it works

From new job to submitted RAMS in minutes

No health & safety qualification, no blank page, no consultant on speed dial.

1

Tell us about the job

Pick your trade and the task, enter the site and a few specifics — address, dates, who's principal contractor, anything unusual about the site.

2

We build the RAMS around it

RapidRAMS assembles a site-specific risk assessment and method statement from your reusable methods — real hazards, specific controls, the right sequence. Edit anything you like.

Export, brief, submit

Download a clean, branded PDF, brief your crew, and send it for approval — built to be accepted first time so you're on site when you said you would be.

Trades

Built for the trades that live on RAMS

If you can't start on site without a method statement signed off, RapidRAMS is built for you.

Structured around CDM 2015
Risk assessments and method statements laid out the way principal contractors and H&S advisors expect to read them.
Specific controls, not "take care"
The vague-controls and wrong-site-name mistakes that get RAMS rejected are designed out from the start.
Reuse, don't rewrite
Your methods become a library. Each new job starts from what you've already written — just swap the site details.
Founder-led onboarding
Early users get direct help setting up their first methods and getting their first RAMS out the door. Data held in the UK.

No RAMS, no start. Stop losing evenings — and start dates — to paperwork.

RapidRAMS gives UK trades a faster way to produce site-specific method statements that get accepted first time. Join the early access list.

Early access is limited. Free plan at launch. No card required.

You're on the list. We'll be in touch soon.